DIMENSION 01
Ceremony Restructuring
Six core Agile ceremonies evolved into AI-era equivalents. Each has an original name — original AEVA intellectual property not existing in any prior methodology framework. The primary delivery unit shifts from Sprint to Increment — scope-defined, not time-defined.
PRECISION BACKLOG REFINEMENT
Replaces Backlog Refinement
- - Core innovation: Functional-Technical AC Taxonomy — original IP
- - Functional AC: written by PO, describes WHAT the system does, human-authored, non-negotiable
- - Technical AC: AI-generated from Functional AC, human-reviewed by AC Architect
- - Hallucination boundary: when Functional AC is ambiguous, AI fills the gap incorrectly. The governance solution is airtight Functional AC — not more capable AI.
- - Pre-meeting: AI decomposes epic, generates Technical AC, scores DCI. During meeting: humans verify correctness and AC precision only. Duration: dramatically reduced.
INCREMENT PLANNING
Replaces Sprint Planning
- - Dual-Track Capacity Model: Track 1 (DCI 4-6, AI-Executable) — bounded by QA review bandwidth, not coding velocity. Track 2 (DCI 11-16, Human) — traditional capacity calculation.
- - New formula: Available QA review bandwidth ÷ Average AI output review time = Maximum AI-executable features per Increment
- - Traditional: 2-4 hours estimation debate. AEVA: 45 minutes commitment and sequencing.
- - Governance enforced upstream as infrastructure — never debated in the meeting.
PULSE SYNC
Replaces Daily Standup
- - Layer 1 — AI Pulse (async, pre-meeting): automated dashboard — AI completion status, burn rate, blockers, QA backlog. AI generates it. Nobody presents it. Removes all status reporting from human conversation.
- - Layer 2 — Human Sync (8 minutes synchronous): decisions required today, cross-functional collaboration, human energy signals no dashboard captures.
- - Traditional: 15 minutes, primarily status reporting. Pulse Sync: 8 minutes, exclusively decisions and cohesion.
DATRETRO
Replaces Sprint Retrospective
- - Phase 1: LLM pre-analyses Increment data — commit logs, velocity, blockers, defect patterns, Feature Clearance compliance rates. Generates evidence-based responses to the three retrospective questions.
- - Phase 2: humans make decisions on evidence. "The data shows X — why did that happen, and what do we own as humans to fix it?"
- - Explicitly includes AI output quality as a retrospective variable — no traditional retrospective does this.
INCREMENT GOVERNANCE REVIEW
Replaces Sprint Review
- - Two-tier model: Tier 1 — continuous Human Acceptance Gate (PO reviews features as they complete, no ceremony, CI/CD principle applied to human intent validation). Tier 2 — formal 60-90 minute ceremony at Increment end.
- - Four Tier 2 objectives: integration verification, business alignment, AI governance posture review (what did AI decide autonomously, what did humans override), DCI calibration signal.
- - Governing principle: review cadence is human-paced, not AI-paced.
FEATURE CLEARANCE
Replaces Definition of Done
- - Governance unit shifts: Stories are execution units. Features are governance units.
- - Gate 1 — Technical Completion (Tech Lead + AI Output Validator): stories complete, hallucination check documented and cleared, Functional AC compliance confirmed, deployed to staging.
- - Gate 2 — Governance Log (AI Delivery Orchestrator, max 10 minutes): DCI audit trail, AI vs human decision summary, regulated domain flag.
- - Progressive Governance Lightening: Feature Clearance is the lightest ceremony by design — all governance work done upstream.
- - Non-negotiable: nothing enters production without both gates cleared.